| - |
to every insulation defect belongs a structure/corrosion
potential value
|
| - | these measured (real) values serve the basis for the
calculation of the insulation defects (% IR)
|
| - | the potential measurement takes place exactly above
the pipeline
|
| - | the measurement needs only one team performing one
survey |
| - |
we ensure the comparability of the CIPS and DCVG data
by means of the simultaneous readings at a given place
and time the soil-, corrosion characteristics and other
factors are the same
|